Research Grant

Head of Project:

Title: Field Programmable Gate Array (FPGA) Based Fuzzy Logic Controller for DC-DC Converter System

Fund: New Staff with PhD Grant (NAS)

Period: November 2009 - November 2010

Fund amount: RM 10,000.00

Status: Finish with Final Report

Title: Control Strategy of Z-source Inverter for Electrical Motor Drive

Fund: Fundamental Research Grant Scheme (FRGS)

Period: September 2010 - August 2012

Fund amount: RM 46, 400.00

Status: Finish with Final Report

Title: Z-Source Inverter for Electric Vehicle Adjustable Drive

Fund: Research University Grant (Tier 2 RUG)

Period: April 2011 - March 2012

Fund amount: RM 40,000.00

Status: Finish with Final Report

Title: Photovoltaic Based Power Converter for Distributed Generation System

Fund: Sciencefund (MOSTI)

Period: 2012 -2014

Fund Amount: RM 120, 000.00

Status: Finish with Final Report

Title: Tabung Khas Proton Green Mobility Challenge 2012

Fund: UTM

Period: May 2012 - December 2012

Fund Amount: RM95,000.00

Status: Finish with two awards

Title: Maximum Power Point Tracking (MPPT) of Solar Photovoltaic (PV) System based on Evolutionary Algorithms (EAs)

Fund: Research University Grant (Tier 1 RUG) UTM

Period: Dec 2012 - Jan 2016

Fund Amount: RM 120,591.99

Status: Finish with Final Report

Title: Design and Development of Vehicle System Controller for e-ATV

Fund: Research University Grant (Flagship)

Period: July 2014 - Dec 2016

Fund Amount: RM 90,000.00

Status: Finish with Final Report

Title: MODULAR STRUCTURED MULTILEVEL INVERTER WITH REDUCTION IN SWITCHING COMPONENTS COUNT

Fund: Research University Grant (Tier 2)

Period: Feb 2018 - Jan 2019

Fund Amount: RM 20,000.00

Status: On-going

Co-researcher (Recent):

Title: Soft Computing Approach to Formulate a New Photovoltaic Inverter Efficiency for SystemInstalled in Tropical Region

Fund: FRGS, MOHE

Period: June 2017 -May 2019

Fund Amount: RM178,000.00

Status: On-going

Title: Direct Torque Control for Induction Motor fed by Multilevel Inverter

Fund: RUG, Tier 2

Period: Feb 2018 - April 2019

Fund Amount:RM20,000.00

Status: On going

Title: Novel Direct Torque Controller with Optimum Efficiency for Electric Vehicle Application

Fund: FRGS, MOHE

Period: Dec 2013 -Nov 2015.

Fund Amount:RM80,000

Status:Finish with Final Report

Title: INTERCONNECTION AND DAMPING ASSIGNMENT (IDA) PASSIVITY BASED CONTROLLER (PBC) FOR MULTILEVEL INVERTER

Fund:RUG, Tier 2

Period: July 2014 - June 2015

Fund Amount: RM 20,000.00

Status:Finish with Final Report

Title: Fundamental Study of a Bidirectional DC-DC Converter and Battery Bank Interface in Electric Vehicle

Fund: Fundamental Reseach Grant Scheme (FRGS), MoHE

Period: 2010 - 2012

Fund Amount: RM 50, 000.00

Status:Finish with Final Report